PT Pembangunan Perumahan (Persero) Tbk. (PTPP) accelerates the construction of Kaligawe-Sayung Lane, which spans the total length of 10.6 kilometers, of the Semarang-Demak Toll Road with the aim to be completed in 2026. This acceleration is in line with its plan to conduct asset recycling in 2027 or after the project is fully connected and operational. PTPP aimed to obtain more than Rp10 trillion from this plan.